Hüseyin Güzel

Project Site Manager and Master Student in Ankara, Turkey

Visit my website

Hüseyin GÜZEL started to educational life in Ankara. He graduated from Abdullah Tokur Primary School in 2000 and graduated from Ankara Atatürk Anatolian High School in 2004. Also he began to college life in the faculty of dentistry at Hacettepe University. However he decided that it is a false choice and graduated from the department of Electrical and Electronics Engineering at Hacettepe University in january 28, 2014 and He took courses such as High Voltage Techniques and Power System Analysis which are required for Electrical Engineering in 2013 and 2014 summer schools at Eskişehir Osmangazi University and Now he's ongoing for master's degree in the field of Electrical Machines & Power Systems at Yıldırım Beyazıt University.

He's realized several projects with his college friends in the process of engineering training. These projects are WSN-BSS which is his graduation project and EDELS which is a project assignment of Embedded Systems Course (ELE417)

He completed to engineering internship in two different companies. These are EMT Electric and VERA Elektromekanik Companies. He's worked about Electricity Project in the electrical construction site of Ankara Acıbadem Hospital at EMT Electric and Also he's worked about the design and generation of PLC & various types’ automation panels at VERA Elektromekanik

He started to business life as an Electronics R&D Engineer at AKYA Company. Fields of work were hardware design, Embedded design, and Technical support. He's also performed two different projects such as Win7&XP Touch Tablet PC Design and Smart Card Reader

Between 2014 and 2016, He worked as a Maintenance & Repair Engineer in electrical maintenance unit which consists of 3 engineers and 15 technicians in the field of 3x135MW Silopi Thermal Power Plant at Ciner Group.

He has took an active role as a Project Site Manager at GE - Grid Solutions in the scope of 154kV Extension Project which is a turnkey project to meet the energy needs of Process C line, which increases the production capacity of the Eti Soda Plant within the Ciner Group between March 2016 and April 2017 years

Now, He keeps working life as a project site manager from May 2017 at EMTA Energy, which draws a rising graph and moves steadily toward 2020 targets.

  • Work
    • EMTA Group - EMTA Energy
  • Education
    • Hacettepe University
    • Yıldırım Beyazıt University