Noor Abu Al Nour
Civil Engineer and Site Planning Engineer in Jordan
Noor Abu Al Nour
Civil Engineer and Site Planning Engineer in Jordan
Noor Al-Deen Abu Al Nour
Address: Amman, Jordan
Email: [email protected]
Place/ Date of Birth: Amman, 9th November 1992
Nationality: Jordanian
Marital Status: Single
Driving license: Valid Jordanian Driving License
Academic Qualifications
• Bachelor Degree of Structural Engineering in August 2015 From (Misr University for Science and technology) In Egypt with a Good Degree.
• High School Class “Tawjihi”/ scientific branch Degree in 2010 with 79.8% degree.
Technical Skills
• Planning and Preparing baseline schedules Using Primavera P6 With PMI license
• Quantity Surveying And Engineering Plans.
• Well verse with Auto CAD.
• Very Good In Using Microsoft Office.
• Analyzing various structures using SAP.
• Design And Analysis Structural Element Using PROKON.
Language Skills
• Arabic: Mother language
• English: Very Good
Academic Projects Undertaken
Carried out a 8 months Graduation Project on that include :
High Rise Building
Tanks
Halls
Training Experience
Successfully completed 200 hours vocational training with “The Arab Contractors CO.”.
Courses
1. Plans Reading “Jordanian Engineers Association”.
2. AutoCAD “Jordanian Engineers Association”.
3. PROKON “Jordanian Engineers Association”.
4. Primavera P6 “PMI license from CMCS Jordan”.
5. ICDL “Misr University for Science and Technology ”.
6. Quantity Surveying “The Arab Contractors (Egypt) ”.
Experience
1. “CMCS Jordan” From April 2016 to Present.
Project Name:
I. Al-Balqa' Applied University (Engineering Faculty)
II. Renovation and Maintenance work for selected kindergartens in Jordan
Founded By UNICEF
Responsibilities:
¬ Make short-term detailed programs based on sequence of work, wherein look-ahead programs, concrete forecast and labor forecast reports were also taken from and based upon.
¬ Update programs on a weekly and monthly basis and on request by the construction and management team.
¬ Attend weekly progress meetings for coordinating, updating and reporting. Directly reporting to the Project Manager.
¬ As-built programs and reports for delay analysis and early warning notices were also prepared using Microsoft Office and Primavera software.
¬ Generate weekly reports for productivity monitoring purposes. These include the progress, productivity, resource utilization and mark-ups.
¬ Make regular site visits in order to have an accurate update and to take progress photos for documentation.
¬ Check drawings regularly for material take-off and for recording issue/revision dates. Had an organize